Railway Services Affected on Jodhpur Phulera Section from May 23 to 25 Due to RUB Construction at Merta Road

Train services on the Jodo Railway Under Bridge construction at Merta Road station. Several trains have been cancelled, partially cancelled, diverted, or delayed, and passengers are advised to check updated schedules before travel.

Railway services on the Jodhpur–Phulera section will be affected between May 23 and May 25 due to construction of a Railway Under Bridge (RUB) at Merta Road station yard, according to North Western Railway.

A block has been taken on the track at Railway Crossing No. 100 in the Merta Road station yard to facilitate RUB construction, impacting the movement of trains on this route.

Full Cancellation of Train Services

The following trains will remain fully cancelled between May 23 and May 25:

Jodhpur–Hisar Express (14891) – May 24
Hisar–Jodhpur Express (14892) – May 25
Jaipur–Jodhpur Express (22977) – May 24
Jodhpur–Jaipur Express (22978) – May 24

Passengers have been advised to make alternative travel arrangements due to these cancellations.

Partial Cancellation of Train Services

Some trains will operate only on partial routes:

Jodhpur–Delhi Sarai Express (22422) – to operate from Degana
Jodhpur–Bathinda Express (14721) – to operate from Bikaner
Abohar–Jodhpur Express (14722) – to operate up to Bikaner
Hisar–Jodhpur Express (14892) – to operate up to Degana
Delhi Sarai–Jodhpur Express (22421) – to operate up to Degana

Diversion of Train Routes

Several trains have been diverted during the construction period:

Jodhpur–Bhopal Express (14813) – via Luni, Marwar Junction, Ajmer
Barmer–Rishikesh Express (14888) – via Phalodi, Lalgarh, Bikaner
Hanumangarh–Dadar Express (14707) – via Bikaner, Phalodi
Rishikesh–Barmer Express (14887) – via Bikaner, Phalodi
Bhopal–Jodhpur Express (14814) – via Ajmer, Marwar Junction
Varanasi City–Jodhpur Express (14853) – via Ajmer
Delhi–Jaisalmer Express (14087) – via Ajmer
Bikaner–Madurai Express (22632) – via Ratangarh, Sikar, Jaipur

Additional stoppages have been provided at several stations due to these route changes.

Railway Services Affected on Jodhpur Phulera Section from May 23 to 25 Due to RUB Construction at Merta Road

Regulation and Delays in Train Operations

Timings of some trains have been adjusted:

Kamakhya–Bhagat Ki Kothi Express (15624) – delayed by 2 hours on May 22
Indore–Jodhpur Express (12465) – delayed by 20 minutes on May 24
Jodhpur–Delhi Sarai Express (22481) – delayed by 30 minutes
Jaipur–Jaisalmer Express (12468) – delayed by 30 minutes

Passenger Advisory

Railway authorities have advised passengers to check the status of their trains before travel. Changes in operations may affect travel plans, and passengers are encouraged to use online platforms or railway helplines for updates.

Reason for Service Changes

The construction of the Railway Under Bridge at Merta Road station is being carried out to improve traffic movement and safety. The work is causing short-term disruption to train services.

 

Leave a comment